Hiring a HVAC Engineering Company in Glen Ellyn

Contact Us!

In search of a top rated HVAC Chicago? The one to go to is NY Engineers. Not only for HVAC Chicago but also Construction Engineering and Sprinkler Engineering in Glen Ellyn. Call (+1) 312 767.6877

Contact Us!
MEP Meaning

Many construction companies throughout Ronkonkoma, New York already know that New York Engineers is the engineering company to call if you’re searching for Value Engineering in NY. What a lot local building owners have not realized is that NY-Engineers.Com is also your best choice if you’re searching for HVAC Engineering services in Glen Ellyn, Illinois.

Employing a HVAC Contractor in Glen Ellyn requires the capability to examine and recognize what is required for your construction. Each individual will probably be dissimilar when it comes to the signing process and it’s best to think about the next behaviours.

1) Expertise: A good firm will always have skilled employees on the team to aid with HVAC needs. They aren’t only skilled but are going to have many years of expertise in the business. This keeps things streamlined, simple, and as proficient as you need them to be. Customers would feel more comfortable with a specialist readily available to aid.

2) Portfolio of labor: Take a look at their track record to see exactly how they’ve done in the past. This could help spell out whether or not the company is a avid team that achieves great outcomes. If you find problems with their portfolio then It is gonna sort into your setup. Center on this as soon as possible!

Those characterize the tips for getting a top-tier company and ensuring that the solution is up to scratch. If not, the company can find themselves causing more issues than answers. Start with the following tips and write a simple list to have the method easier.

That is why many engineers are employed as consultants because they gain experience. That is when, they are only responsible for the following part of the style and will give insight on what works or what doesn’t.  Most HVAC systems are creaded through the help of an Glen Ellyn HVAC design engineer.

Main HVAC Design Engineer Duties

An HVAC design engineer in Glen Ellyn is going to be given a listing of assorted duties dependant upon the firm, its needs, and just how the project grows.

On the whole, the HVAC design engineer duties will include a variety of tasks including designing various HVAC systems. Each duty will be unique because customers come in with tailored needs. These demands could include the size of their setup, how it is gonna operate, and the performance metrics they’re after with a new HVAC system.

A certified Glen Ellyn HVAC engineer will probably sit down, understand these needs, and pre-plan a complete HVAC system using high-quality design instruments. All things are kept in mind in this process and that’s what HVAC design engineers are relied on to perform. Together with designing the HVAC system, the engineer has to be certain the system is done properly and fits in accordance with just what the requester needs.

That is why a lot of engineers are brought on as consultants while they gain experience. In those situations, they might be only responsible for the following step of the design and will offer insight about what works or what doesn’t.  Most HVAC systems are begun by using an HVAC design engineer in Glen Ellyn. There is a great possibility you would like more details on the HVAC Engineering services in Glen Ellyn, Illinois by NY Engineers you should visit at our Glen Ellyn Sprinkler Engineering blog.

New Energy Modeling Related Article

Simplify Your MEP Engineering Design: Put an End to Over-Engineering

Fire Protection Engineering Jobs

The “more is better” mindset does not always apply in MEP engineering projects. Over-engineered components often increase project costs without providing any real benefits, and there are many cases where excessive capacity in fact has negative consequences on performance and service life. Another type of over-engineering occurs when the system used for a specific application is too complex, and a much simpler solution would have been possible without compromising performance.

General Disadvantages of Over-Engineering

Regardless of the specific application, over-engineering drives up project costs without offering significant benefits: oversized components are more expensive, and the associated labor cost also increases because equipment becomes more difficult to handle.

When mechanical, electrical and plumbing systems are too complex for the application at hand, there is also a higher chance of error during construction, due to the introduction of unnecessary components. This increases the chance of MEP engineering professionals and others involved in the project having to deal with change orders during project construction.

Over-engineering also brings performance issues that are specific to each type of building system. HVAC installations tend to suffer the most: an over-engineered system can be just as problematic as an undersized one, if not more.

Oversized Electrical Circuits

The main issue with oversized electrical circuits is their high cost. In fact, performance is improved: oversized conductors reduce both heat dissipation and voltage drops. The problem is that these benefits are not enough to justify the drastic increase in costs:

  • Copper is expensive.When you consider that a typical building has thousands of feet of electric circuits, the cost of oversized conductors adds up very quickly
  • Conduit diameter is increased.Electric codes establish a maximum fill percentage for conduit, so increased conductor capacity also involves larger conduit and accessories.
  • Labor costs are increased.Since they are more difficult to handle, larger conduit and circuits typically require more man-hours of work. In most cases, specialized tools may also be needed.

When the extra costs of oversized conductors are considered, they far outweigh the benefits. Oversized conductors are particularly common with energy-efficient HVAC equipment – they are often specified based on “rules of thumb” that only apply for older and less efficient equipment.

The NEC and other electric codes may establish a maximum allowable voltage drop. It varies depending on the application, but in most cases either 3% or 5% is used. In these cases, conductor diameter should be raised so that voltage drop is brought to acceptable levels, but any further increases are unnecessary.

Using various supply voltages in the same installation is an excellent way to optimize conductor diameters. Keep in mind that power transmitted is proportional to both voltage and current, but only current defines conductor diameter. If a piece of electrical equipment draws too much current at 240 V, it makes sense to increase rated voltage to 480 V – this reduces line current, allowing smaller conductors to be specified. Of course, these are design choices that can only be determined by qualified professionals.

Oversized Electric Motors

In the case of electric motors, over-engineering tends to bring far more issues than with conductors. When subject to part-load conditions, electric motors display two main types of negative behavior:

  • They suffer a drastic reduction in efficiency when the mechanical load on their shaft is much lower than their rated load. For example, a motor loaded at 80% does not suffer an efficiency drop, but for values under 50% the effect becomes significant.
  • Power factor is also reduced when a motor is loaded lightly. Utility companies normally establish a minimum power factor for their consumers, and there are extra power bill charges for falling below that value.

Of course, another drawback of oversized electric motors is the drastic price increase. Motors can be among the most expensive pieces of electrical equipment, and oversizing them only reduces efficiency and power factor.

When specifying electric motors, special consideration must be given the voltage rating, since it determines the characteristics of all circuits and breakers located upstream. Large motors may justify the use of voltages such as 480V or 600V to prevent excessively high currents.

Air-Conditioning Systems

There are many types of air-conditioning systems, including mini-split units, packaged terminal air conditioners (PTAC), packaged rooftop units (RTU) and heat pumps. However, over-engineering tends to bring a common set of performance issues:

  • Oversized compressors run in shorter and more frequent cycles, which is detrimental for their components and results in increased maintenance expenses. Keep in mind that compressor motors draw an inrush current that is several times their rated value each time they start – ideally, they should not cycle more than necessary.
  • Air conditioning systems have the goal of controlling both temperature and humidity, but many types are cycled on and off based on temperature alone. Since oversized units reach the temperature set point faster, they are unable to extract enough humidity and the resulting environment is cool but humid. This is uncomfortable for occupants, and may bring health issues as well.

Compressors are not the only AC system components that bring performance issues when oversized. In system configurations that use air ducts, over-engineering also brings several negative consequences. For example, oversized ducts involve displacing a large volume of air, which drives up the CFM and power requirements of blowers.

In chiller plants and other types of AC installations that use hydronic piping, the extra cost associated with over-engineering can be particularly high. Other than being expensive, oversized piping requires more pumping power, increasing the nameplate capacity of both pumps and motors.

For air conditioning installations that will be subject to gradual capacity increases, variable refrigerant flow (VRF) systems can be a great choice – their modular nature offers great flexibility to size their capacity precisely depending on building needs. Chiller plants also offer flexibility, but are better suited for larger capacity increments than those typical of VRF systems.

Heating Systems

For heating systems that are based on heat pumps, the same logic of air conditioning installations applies: oversized compressors suffer from frequent cycling and normally experience a diminished service life.

In the case of oil and gas boilers, the main drawback of over-engineering comes from short cycling: a phenomenon that occurs when an oversized boiler meets heating demand too quickly and then shuts down. To better understand the impact of short cycling, consider that boilers operate in a four-step cycle: pre-purge, firing interval, post-purge and idle period. When the firing interval is short, several negative consequences arise:

  • The boiler radiates heat from its enclosure through the entire cycle, including the two purge phases and the idle period. Oversized boilers waste more energy in the form of radiated heat.
  • During the pre-purge and post-purge steps, fans are used to displace any flammable mixture of gases that may have been left in the boilers. Both purging stages consume energy.

Although gas and oil boilers can cycle depending on the load, doing so is very inefficient. A superior alternative is to use two or more boilers of reduced capacity, which offers the flexibility to meet varying load conditions with energy-efficient operation. If there is a large demand for heating at any given moment, for example on Monday mornings during the winter, all boilers can be used simultaneously. Then, some of the units can be shut down to avoid short cycling losses.

The misconception that a larger boiler is better dates to the time when fireplaces and chimneys were used for indoor heating: a larger chimney offered greater flexibility to accommodate fires of any size. However, modern boilers operate on completely different physical principles, and the assumption no longer holds.

Concluding Remarks from an MEP Engineering Professional

Over-engineering can be favorable in specific applications where a high safety factor is required, but in most cases, it only drives up MEP engineering project costs without a significant return on investment. In fact, oversized systems typically come with a higher cost of operation due to inefficient operation and frequent maintenance expenses. Hiring the services of a qualified design firm is the best way to ensure MEP installations are engineered properly.

Top Searches Related to HVAC Engineering in Glen Ellyn, IL.

Value Engineering Examples

HVAC Engineering Glen Ellyn, IL

What Can Our HVAC Engineers in Glen Ellyn Do For You? When you're looking for a competent HVAC Firms in Chicago? Your best bet is to reach out to is New York Engineers. Not only for HVAC Engineering in Chicago but also Mechanical Engineering and Protection Engineering in Glen Ellyn. Contact us at (312) 767.6877 Since 2011 a great number of developers throughout New City, NY already know that NY Engineers [...]

2018-10-25T02:16:42+00:00