HVAC Engineering Oak Park Chicago, IL 2018-10-25T00:02:56+00:00

What Can Our HVAC Engineers in Oak Park Chicago Do For You?

How To Become An HVAC Engineer

Since 2011 a lot of building owners throughout Monsey, NY already know that NY-Engineers.Com is the engineering company to contact when you’re ooking for HVAC Engineering in NY. What many local property owners have not realized is the NY-Engineers.Com is also your best choice if you’re looking for HVAC Engineering services in Oak Park Chicago, IL. If you want to understand more about what Oak Park Chicago HVAC design engineers do? It is an exceptional job which inclides a detailed set of responsibilities. An HVAC design contractor will be asked to work through several problems to resolve the underlying issue. This job calls for distinct talent, proficieny, and the opportunity to deal with time cleverly.

The moment an HVAC contractor is licensed to operate, they may get employed by an engineering business and start to operate various cooling, heating and refrigeration systems. Their function is to design new and/or alternative options according to their customer’s requests. Every single customer is going to have a unique set of needs whether or not it has to do with constructing codes or individual performance anticipations. Making use of this material, the engineer goes on a journey towards making something that is eco-friendly, energy-efficient and well suited for the location it might be placed in – (industrial, commercial or residential. They are generally in charge of the original drawings and overseeing the specific installation.

In general, an HVAC engineer in Oak Park Chicago will be seen working with a design business or even in a consulting firm according to their numerous years of skill. A great deal of engineers transition right into a consulting job as they get older and acquire a better knowledge of what is expected of them.

Comparison: HVAC Technician vs HVAC Engineer

HVAC Technician and HVAC Engineer tend to be mistaken for one another. Still, they may have separate tasks with regards to handling HVAC systems. It is important to are aware of the variance both as a parton also as a specialist

An HVAC technician in Oak Park Chicago carries a more active job, meaning they are often seen on the way to a client’s property to inspect their current system. They often handle the installations, repairs, and general upkeep that is needed every now and then. The majority of their work is done together with the customer, which implies they have to discover how to communicate with people in the correct manner.

With an HVAC engineer, they are responsible for creating a new HVAC system and ensuring it fits what a client needs. It needs to fit just what the house owner wants whether it involves their setup, property, or anything else associated with new system. Also, they are introduced to talk on HVAC designs to make certain things are in accordance with modern standards. This is why they can find themselves spending time in consulting assignments or at local engineering firms. That is basically the difference between both of these career paths; HVAC Technician vs HVAC Engineer. Even with all of this information you would like more information about the HVAC Engineering services in Oak Park Chicago, IL by New York Engineers we invite you to take a look at our blog.

Oak Park Chicago HVAC Engineering Related Blog Post

How to Select a Contractor for Mechanical Engineering Projects

Architecture Engineering Subjects

Tips for Effective Contractor Selection in Engineering Projects

One of the key elements that determines project success is selecting the right contractor for the job. Although it may be tempting to focus on minimizing cost, a better approach is to maximize value and optimize cost. After all, a mechanical engineering project of any kind is an investment; the best offer is not always the one with the lowest price, but the one that offers the highest return on each dollar spent.

Effective communication is key during the bidding process: if the participating contractors understand the project requirements clearly, they can craft their proposals accordingly. Without proper specifications, even the most qualified contractors may struggle to provide a suitable offer. Effective communication is so important for project success, that the Project Management Institute dedicates a whole chapter of its Body of Knowledge to the topic.

Before proceeding with a bidding process, hiring an engineering consulting or supervision firm is highly recommended. They can help you expedite the process, while providing technical guidance and managing correspondence with contractors. Even with a clearly defined project scope, it is normal for contractors to request additional information or clarifications.

Bid Leveling: Setting a Common Ground for Comparison

Project bids can only be compared with each other if the contractors are quoting the same scope of products and services. When sending a Request for Proposals (RFP), include a scope document that breaks down the work into specific items, and where each item is priced individually. This allows bids to be compared side by side, something not possible when each contractor provides a different breakdown of the project work.

Creating a detailed project scope consumes extra time at the beginning but saves much more time later in the process. Since bids can be directly compared to each other, communication becomes more effective during the contractor selection process, reducing the number of clarifications and requested corrections.

The Project Management Institute (PMI) recommends using a Work Breakdown Structure (WBS) to define project scope. In simple terms, a WBS decomposes the project work into a series of levels, where work definition becomes more specific for each descending level, and specific project items are described at the lowest level. The following is an example:

  • A construction project WBS may have a category called Electrical Installations(Level 1).
  • That category can be subdivided into sections such as Lighting Installationsor Electrical Receptacles (Level 2).
  • Specific lighting fixturesare specified in the lighting installations section, as well as their required quantities (Level 3). For example, an item in the list can be described as: Recessed Commercial LED Fixture, 2ft x 4ft, 4000 lumens, clear white light (4100K). This is an item that can be priced specifically by the contractors participating in the bid.

A list of items that is broken down by categories and subcategories is much easier to understand than a plain list where elements from different building systems are combined. An engineering consulting firm can help you put together a WBS effectively. With this bidding format, detecting discrepancies also becomes easier; for example, if five contractors are participating and one of them priced an item significantly lower than the other four, it is likely that there was a mistake or misinterpretation.

Importance of a Mechanical Engineering Professional’s Technical Point of View

When comparing bids for a project, the opinion of a neutral and qualified third party is highly recommended, and the best recommendation is to hire the services of an engineering consulting or supervision firm. This way, each item on the project scope can be assessed based from the financial and technical standpoint in relation to mechanical engineering, ensuring that the price provided by a contractor is reasonable according to technical specifications. To define what can be considered cheap or expensive in engineering, a degree of industry know-how is required.

An engineering consultant or firm can also determine if any items in the project scope are priced too high or too low, and then request a clarification from the respective contractor. Low prices are only good news if they are reasonable; unrealistic prices are likely the result of a mistake by the bidding contractor. However, these conclusions can only be reached with a thorough understanding of different building systems and the prices that can be expected.

Equipment Submittals

In simple terms, submittals can be defined as any information on equipment and materials, provided by a contractor for approval before the project is awarded. Some of the most common types of submittals include technical cut sheets, shop drawings and material samples.

Building system components must generally meet a series of requirements and standards. Equipment from reliable manufacturers comes with technical cut sheets, which provide a detailed description of product features and compliance. However, not all contractors work with the same providers, and the contractor selection process may involve comparing equipment from different suppliers for a single item in the project bid. Although equipment cut sheets are available in the Internet, searching for them can be very tedious when dealing with a large project. For this reason, it is very important the contractors participating in a bid provide cut sheets of all the proposed equipment.

Some elements of building systems that perform critical functions or involve a high degree of complexity cannot be described effectively with only textual specifications and general construction plans. In these cases, requesting shop drawings from contractors is recommended, providing specific details on how the component will be manufactured or installed. Shop drawings are especially important in projects that involve custom-built components.

In some projects, it may also make sense to request material samples from the participating contractors, generally with the test results from a qualified laboratory. This is common with concrete, for example, due to how important it is for the structural integrity of a building.

Project Plan: Defining the Timeframe

Contractor bids must clearly define what will provided and at what price, but it is also necessary for them to determine timeframes. This provides a baseline against with the project owner can assess progress, and it is also useful for scheduling intermediate project payments. Completing a project successfully generally involves a detailed planning in terms of time, resources and cost.

  • Time: Many project activities follow a logical sequence. For example, roofing installation can only proceed if the underlying structure is already built, and painters must wait for the walls to be completed. A Gantt chart is the best tool for showing the sequence of project activities and their completion times, and it also allows the identification of critical activities that delay the whole project if delayed individually – noncritical activities have a slack time, and can be delayed to a degree without compromising project completion.
  • Resources: Engineering projects involve personnel and equipment, and in a well-planned project the contractor knows from the start the activities in which these resources will participate at a given time.
  • Cost: After a contractor has developed a Gantt chart and priced each activity, it is possible to estimate a cost calendar. This provides the client a clear idea on how the project budget will be used over time, allowing payments to be scheduled more effectively.

The Project Management Institute places high emphasis on project planning, since it provides a basis against which project progress can be compared in terms of scope, time and cost. When comparing bids from different contractors, verify that timeframes and resource allocation are realistic. A bid can meet all project requirements at a reasonable time, while still being lacking in terms of planning.

Conclusion

When carrying out a mechanical engineering project, avoid awarding the job blindly to the contractor with the lowest price. Keep in mind that building systems must meet a series of standards, and there is a limit to how low a specific system can be priced. Also make sure that all bidding contractors provide a detailed project plan, providing details on their expected project timeframes and resource allocation

Top searches related to HVAC Engineering in Oak Park Chicago, Illinois.