HVAC Engineering Old Town Triangle Chicago, IL2018-10-08T01:58:25+00:00

What Can Our HVAC Engineers in Old Town Triangle Chicago Do For You?

Contact Us!

When you re searching for a reliable HVAC Engineering in Chicago? The one to go to is NY-Engineers.Com. Not only for HVAC Engineering in Chicago but also Architectural Engineering and Sprinkler System Engineering throughout Old Town Triangle Chicago. Call (312) 767.6877

Contact Us!
How To Become An HVAC Engineer

For more than 10 years the majority of construction companies throughout West Islip, NY already know that NY Engineers is the engineering firm to call when you’re ooking for HVAC Engineering in NYC. What a lot local construction companies have not realized is the NY-Engineers.Com is also your best choice if you’re looking for HVAC Engineering services in Old Town Triangle Chicago, IL. If you want more information on what Old Town Triangle Chicago HVAC design engineers do? It is a unique job that come with an extensive listing of responsibilities. An HVAC design contractor will be asked to go through numerous challenges to solve the original issue. This task calls for superior skill, competence, and the capability to deal with time cleverly.

After an HVAC personel is certified to operate, they may join up with an engineering business and begin to functions on several heating, cooling, and refrigeration systems. Their responsibility is to design new and replacement choices according to their customer’s requirements. Each customer is going to have an exclusive set of wishes whether it involves developing codes or personal performance prospects. Using all of this material, the engineer goes on a journey towards creating something that is energy-efficient, eco-friendly and suitable for the setting it might be used in – (industrial, commercial or residential. They usually are liable for the original drafts and managing the actual installation.

On the whole, an HVAC design engineer in Old Town Triangle Chicago will likely be seen working in a design business or maybe in a consulting firm depending on their numerous years of expertise. Many engineers switch to a consulting job since they get older and achieve a better understanding of what is expected of them.

Comparing HVAC Technician Versus HVAC Engineer

HVAC Technician and HVAC Engineer are often confused with each other. Nevertheless, they may have separate job functions in terms of handling HVAC systems. It’s important to be aware of the variance both as being a parton as well as an expert

An HVAC technician in Old Town Triangle Chicago carries a more hands-on job, which means they are usually seen heading to a owner’s house to check out their current system. They frequently keep up with the repairs, installations, and overall keep which is needed every now and then. Most of their work is done alongside your client, which suggests they must understand how to communicate with people in the right way.

Having an HVAC engineer, they are accountable for creating a new HVAC system and ensuring it meets just what a customer is after. It needs to fit what the home owner needs whether or not this has to do with their setup, property, or everything else associated with new system. They are also brought in to consult on HVAC designs to be certain things are all in accordance with modern standards. For this reason they may end up spending some time in consulting assignments or at local engineering firms. This is actually the distinction between these career paths; HVAC Technician Versus HVAC Engineer. There’s a great possibility you would like more information on the HVAC Engineering services in Old Town Triangle Chicago, Illinois by NY-Engineers.Com we invite you to visit at our Old Town Triangle Chicago Sprinkler Engineering blog.

New Old Town Triangle Chicago HVAC Engineering Related Blog Post

Simplify Your MEP Engineering Design: Put an End to Over-Engineering

Architectural Engineering Degree

The “more is better” mindset does not always apply in MEP engineering projects. Over-engineered components often increase project costs without providing any real benefits, and there are many cases where excessive capacity in fact has negative consequences on performance and service life. Another type of over-engineering occurs when the system used for a specific application is too complex, and a much simpler solution would have been possible without compromising performance.

General Disadvantages of Over-Engineering

Regardless of the specific application, over-engineering drives up project costs without offering significant benefits: oversized components are more expensive, and the associated labor cost also increases because equipment becomes more difficult to handle.

When mechanical, electrical and plumbing systems are too complex for the application at hand, there is also a higher chance of error during construction, due to the introduction of unnecessary components. This increases the chance of MEP engineering professionals and others involved in the project having to deal with change orders during project construction.

Over-engineering also brings performance issues that are specific to each type of building system. HVAC installations tend to suffer the most: an over-engineered system can be just as problematic as an undersized one, if not more.

Oversized Electrical Circuits

The main issue with oversized electrical circuits is their high cost. In fact, performance is improved: oversized conductors reduce both heat dissipation and voltage drops. The problem is that these benefits are not enough to justify the drastic increase in costs:

  • Copper is expensive.When you consider that a typical building has thousands of feet of electric circuits, the cost of oversized conductors adds up very quickly
  • Conduit diameter is increased.Electric codes establish a maximum fill percentage for conduit, so increased conductor capacity also involves larger conduit and accessories.
  • Labor costs are increased.Since they are more difficult to handle, larger conduit and circuits typically require more man-hours of work. In most cases, specialized tools may also be needed.

When the extra costs of oversized conductors are considered, they far outweigh the benefits. Oversized conductors are particularly common with energy-efficient HVAC equipment – they are often specified based on “rules of thumb” that only apply for older and less efficient equipment.

The NEC and other electric codes may establish a maximum allowable voltage drop. It varies depending on the application, but in most cases either 3% or 5% is used. In these cases, conductor diameter should be raised so that voltage drop is brought to acceptable levels, but any further increases are unnecessary.

Using various supply voltages in the same installation is an excellent way to optimize conductor diameters. Keep in mind that power transmitted is proportional to both voltage and current, but only current defines conductor diameter. If a piece of electrical equipment draws too much current at 240 V, it makes sense to increase rated voltage to 480 V – this reduces line current, allowing smaller conductors to be specified. Of course, these are design choices that can only be determined by qualified professionals.

Oversized Electric Motors

In the case of electric motors, over-engineering tends to bring far more issues than with conductors. When subject to part-load conditions, electric motors display two main types of negative behavior:

  • They suffer a drastic reduction in efficiency when the mechanical load on their shaft is much lower than their rated load. For example, a motor loaded at 80% does not suffer an efficiency drop, but for values under 50% the effect becomes significant.
  • Power factor is also reduced when a motor is loaded lightly. Utility companies normally establish a minimum power factor for their consumers, and there are extra power bill charges for falling below that value.

Of course, another drawback of oversized electric motors is the drastic price increase. Motors can be among the most expensive pieces of electrical equipment, and oversizing them only reduces efficiency and power factor.

When specifying electric motors, special consideration must be given the voltage rating, since it determines the characteristics of all circuits and breakers located upstream. Large motors may justify the use of voltages such as 480V or 600V to prevent excessively high currents.

Air-Conditioning Systems

There are many types of air-conditioning systems, including mini-split units, packaged terminal air conditioners (PTAC), packaged rooftop units (RTU) and heat pumps. However, over-engineering tends to bring a common set of performance issues:

  • Oversized compressors run in shorter and more frequent cycles, which is detrimental for their components and results in increased maintenance expenses. Keep in mind that compressor motors draw an inrush current that is several times their rated value each time they start – ideally, they should not cycle more than necessary.
  • Air conditioning systems have the goal of controlling both temperature and humidity, but many types are cycled on and off based on temperature alone. Since oversized units reach the temperature set point faster, they are unable to extract enough humidity and the resulting environment is cool but humid. This is uncomfortable for occupants, and may bring health issues as well.

Compressors are not the only AC system components that bring performance issues when oversized. In system configurations that use air ducts, over-engineering also brings several negative consequences. For example, oversized ducts involve displacing a large volume of air, which drives up the CFM and power requirements of blowers.

In chiller plants and other types of AC installations that use hydronic piping, the extra cost associated with over-engineering can be particularly high. Other than being expensive, oversized piping requires more pumping power, increasing the nameplate capacity of both pumps and motors.

For air conditioning installations that will be subject to gradual capacity increases, variable refrigerant flow (VRF) systems can be a great choice – their modular nature offers great flexibility to size their capacity precisely depending on building needs. Chiller plants also offer flexibility, but are better suited for larger capacity increments than those typical of VRF systems.

Heating Systems

For heating systems that are based on heat pumps, the same logic of air conditioning installations applies: oversized compressors suffer from frequent cycling and normally experience a diminished service life.

In the case of oil and gas boilers, the main drawback of over-engineering comes from short cycling: a phenomenon that occurs when an oversized boiler meets heating demand too quickly and then shuts down. To better understand the impact of short cycling, consider that boilers operate in a four-step cycle: pre-purge, firing interval, post-purge and idle period. When the firing interval is short, several negative consequences arise:

  • The boiler radiates heat from its enclosure through the entire cycle, including the two purge phases and the idle period. Oversized boilers waste more energy in the form of radiated heat.
  • During the pre-purge and post-purge steps, fans are used to displace any flammable mixture of gases that may have been left in the boilers. Both purging stages consume energy.

Although gas and oil boilers can cycle depending on the load, doing so is very inefficient. A superior alternative is to use two or more boilers of reduced capacity, which offers the flexibility to meet varying load conditions with energy-efficient operation. If there is a large demand for heating at any given moment, for example on Monday mornings during the winter, all boilers can be used simultaneously. Then, some of the units can be shut down to avoid short cycling losses.

The misconception that a larger boiler is better dates to the time when fireplaces and chimneys were used for indoor heating: a larger chimney offered greater flexibility to accommodate fires of any size. However, modern boilers operate on completely different physical principles, and the assumption no longer holds.

Concluding Remarks from an MEP Engineering Professional

Over-engineering can be favorable in specific applications where a high safety factor is required, but in most cases, it only drives up MEP engineering project costs without a significant return on investment. In fact, oversized systems typically come with a higher cost of operation due to inefficient operation and frequent maintenance expenses. Hiring the services of a qualified design firm is the best way to ensure MEP installations are engineered properly.

Common searches related to HVAC Engineering Old Town Triangle Chicago, Illinois.